1- Design and calculation including the preparation and production of all engineering documentation (Engineering)
2. Estimation of Equipment and Supplies (MTO)
3. Supply of equipment and procurement advice (Procurement)
4- Assembly and winding
5. Programming PLC, HMI
6. Testing, delivery and factory inspection (Factory Acceptance Test)
7 Installation & Site Acceptance Test
8. Provision of warranty and support services
Detailed specifications of Huntanir's expertise
1- Design and calculation including the preparation and production of all engineering documentation (Engineering)
Including the production and extraction of project engineering documents and executive management of the board from 0 to 100, such as:
I / O List
Wiring Termination & Interconnection Diagram
Internal Arrangement & Panel Layout
Logic Diagram
Control philosophy
(Single Line Diagram (SLD
Cable Calculation & Sizing
Protection Relay Setting
HMI Pages Design
2. Estimation of Equipment and Supplies (MTO)
Preparing the shopping list in accordance with the requirements of the project (Spec.) And the ability to supply the devices with the priority of the domestic market and the installation space inside the panel.
3. Supply of equipment and procurement advice (Procurement)
Providing equipment or advice with consideration of quality factors, proper lifetime and continuity of supply during operation time.
4- Assembly and winding
Using the standard equipment and the Swedish standard Partridge-based building management system and the IEC standard, taking into account the optimal space
In a panel that allows easy maintenance and maintenance.
5. Programming PLC, HMI
Structured and symbolic programming with the goal of optimal setup and repair along with monitoring, with comprehensive and comprehensive information that provides the most information.
Optically and without disturbance to the operator.
6. Testing, delivery and factory inspection (Factory Acceptance Test)
Using simulator of current and voltage, calibrated measuring devices and simulation of inputs outputs, factory test steps in the presence of the employer
The logic is tested on the basis of evidence and the relevant reports are completed.
7 Installation & Site Acceptance Test
Installing the boards on the relevant stacker on the site, cabling and installing the ladder and cable tray, and laying the cables MV, LV and Termination
Control cables and instrumentation, checking signal. Loop Check and Test, Migra & Hapad, and finally Final Launch and Logic Testing and Delivery to Employer
8. Provision of warranty and support services
Project Material Guarantee, 18 months after FAT or one year after site launch and unlimited support
Carry out power projects, control and industrial automation