Project

Project of 20KV Tabriz Refinery

Assembly and installation of 32 Siemens 20KV-SF6 control boards related to Tabriz Refinery

CPP

CPP Power Plant, Isfahan 2

This panel, implemented with PLC-S7-400H and redundant, was tested and installed on the site with a touch-based monitoring system on-the-go and a computer, each separately monitored.

Iraqi

Iraqi Arbil Oil Storage Project

Design, construction, assembly and commissioning of 3200 amp city distribution boards / generators with 9 sets of 60KW soft starters and 350KVAR automatic capacitor banks

Shirvan

Shirvan Power Plant Refueling Project

Following the increase in the number of tanks from two to five, a new system was designed so that it could be controlled through a complex system of new and old tanks

Saipa

Saipa Company Casting System Control System Project

Assembly, WI-Panel PLC S7-400 SIEMENS and Interface Board

Fuel

Fuel project of Iranshahr Power Plant

The project, sponsored by MAPNA, is powered by a S7-300 series PLC with a printed mimic that facilitates the operation of the operation to control the three-tank annealing system. Marshalling records, REPEATER is also a separate panel In this collection.

The

The project of direct resuscitation of Mega Module Golghor

There are 7 REMOTR I / O S7-300 boards and one PLD S7-400H transmitter and 42 local ET-200 PRO SIEMENS devices.

-

- Chadermollo power plant refueling project

The project, which is sponsored by MAPNA, is a S7-300 PLC series with a printed mimic that facilitates the operation of the operation to control the annealing system. Marshalling records, REPEATER is also a separate panel in this collection. .

South

South Pars Central Power Plant Water Supply Project

The project, which is the first-time contractor of Power Stable Conversion and its parent company, MAPNA's parent company, P.O.G.C, was designed and implemented as a Redundant CPU. The project is based on the Siemens S7-300 Series PLC, based on the Siemens Redundancy Solution and Siemens software solution, and is now on the site of the installation and delivery project of the Employer.

Water

Water Supply System of Kish Island

Construction and assembly of the PLC-S7 300 REDUNDANT panel pumping station in Kish Island

Water

Water Supply Project of Toos Power Plant in Mashhad

The project, which is the first-time contractor of Power Transmission Corporation and its employer, is powered by a S7-200 series PLC with MIMIC, which facilitates operation, to control the system.

Bijar

Bijar Strait Gas District, Ilam Province

Installation of MV & LV boards. Bijar Strait Gas Project

Cain

Cain Power Plant Refueling Project

The project, which is the first-time contractor of Bein Saman Land and its employer, MAPNA, has been using a PLC S7-200 series with a printed Mimic that facilitates the operation of the operation to control the annealing system. Marshalling and REPEATER also They are part of this collection.

Kavian

Kavian Petrochemical Pipeline Control System

It consists of two sets (9) Full Fully Redundant SPIRIT computer with a Siemens Series 400 LED Backend

Cayenne

Cayenne Powerhouse Boiler Project

The project, which is the first-time contractor of Bean Saman Land and the company's mopena company, has been using a S7-300 series PLC for controlling the system. Due to the high number of inputs in the output, which is not enough as a result of a 300 series rack and was used with expansion rack. Also on this board, for the first time, a S7-200 Series PLC was used to implement the Logic Alarm Window (Announciator) as a standard CPU with LED lighting cells. The boiler was made by Pakman Company.

Analyzer

Analyzer of Ali Abad Katoul and Shiraz Power Plants

Construction and assembly of six units of exhaust gas analyzers output of gas units of Ali Abad Katoul and Shiraz power plants

Auxiliary

Auxiliary Boiler Project of Toos Power Plant in Mashhad

The project, which is the first-time contractor for Power Transmission Corporation and its employer, is a OMRON PLC used to control the system.

Bozigan

Bozigan Water Pumping Station in Kazeroon

Design, construction and commissioning of 250KW Soft Starter boards with 2500 amp network with intelligent coupling system.

RO

RO Water Treatment Plant Project Assaluyeh

The project, which is the first-party contractor of Sadra Corporation and its second-hand contractor Ammon Gostar Aria and its main employer, MAPNA, has been using a OMRON PLC with monitoring for monitoring the system.

Two-Diesel

Two-Diesel Emergency Generator Control Project and Switch

The project has been designed and commissioned for two-speed diesel start-ups and the corresponding voltage monitoring, and if a diesel is left out of the circuit, it will be replaced by a LOGO that is used to control the delivery of the employer.

-Project

-Project of Shahid Rajaee port warehouse

Construction and Welding Panel PLC-S7 300 Boiler and Boiler Auxiliary and Heater Piping (Heath Tracing)

Switching

Switching and monitoring project of the danger lights of the nave of Mahan

This project was designed and implemented to control the danger lights of Mahan Imam Khomeini Airport. The monitoring and monitoring of the communication and the safety of the lights are also checked, and if there is a fire or a line failure or even a relay breakdown, we will have alarms for that set. The control of a LOGO has been used and delivered to the employer (Mahan Airlines).

Irvine

Irvine Petrochemical Water Transfer Line

Construction, assembly and commissioning of three sets of three-way control plates 330KW 330KW transmission line Irand Petrochemical water supply with the main key 2500 amps

Heavy

Heavy Trenching Electric Fuel Project for Cayen Power Plant

The project, which has the task of heating the liquid fuel lines from the reservoirs to the Turbine Hall, is now installed on the site of the installation and delivery site of the employer.

The

The project of direct rehabilitation of Chahar Mahal and Bakhtiari Steel

Making and Wiring 8 PLC-S7.300 & CPU-S7.400 / REDUNDANT Panel with 29 PLC ET-200 PRO Local Control Panel

-

- Project for the development of refueling of Ardabil power plant (Sabalan)

Following the increase in the number of tanks from two to six, and in order to use the existing features and panels, while maintaining the original PLC of the old Siemens Series 300, the old panel door was replaced and the processor needed the inputs and outputs needed, and as a whole It was re-programmed. The windows has been replaced and the processor has used a Siemens Series 200. This panel is now on the site of the installation and delivery project of the employer.

Water

Water transfer project from Damsay Dam to Mashhad

Construction and wiring of PLC-S7.400-redundant boards and chlorination boards, balances and valves of the transmission line of the water transmission project from Doshdi Dam to Mashhad

Improvement

Improvement project of Kashan Power Plant boiler

The project, the employer of which is Nikan Process and the main employer of MAPNA, has software and hardware defects that were fixed on the site and delivered to the employer. The controller of this Siemens Series 300 series was.

7.2KV

7.2KV petrochemical sliding boards

Construction, assembling, winding and installation of 9 slab 7.2KV petrochemical equipment in Imam Branch of Pars

Aliabad

Aliabad Power Plants Complete Programming and Commissioning Project

Aliabad Power Plants Complete Programming and Commissioning Project

Reconstruction

Reconstruction of Shawal P & H Electrical Power Panels

Panel 7.2KV Power Supply, Control Panel DC POWER Control Panel Controls Shadam Shadam Mine Chador Malu

Water

Water Supply Project of Shirvan Power Plant

The project, the employer of which is the company's constant energy conversion company and its main employer, is using the Siemens 200 series PLC and is now on the site for the installation and delivery of the employer.

Fuji

Fuji slider boards

Construction and implementation of 6KV 6KV petroleum line in Mahshahr petrochemical plant

 

Hormozgan

Hormozgan power plant refueling

The project, which was co-sponsored by Behin Saman Noorhan and the main employer of MAPNA, was used by a controller PLC that was tested on the site, tested and delivered to the employer.