maron
sm
db
pasargad
morvarid
cnc
petco
630kw
Assembly and installation of 32 Siemens 20KV-SF6 control boards related to Tabriz Refinery
This panel, implemented with PLC-S7-400H and redundant, was tested and installed on the site with a touch-based monitoring system on-the-go and a computer, each separately monitored.
Design, construction, assembly and commissioning of 3200 amp city distribution boards / generators with 9 sets of 60KW soft starters and 350KVAR automatic capacitor banks
Following the increase in the number of tanks from two to five, a new system was designed so that it could be controlled through a complex system of new and old tanks
Assembly, WI-Panel PLC S7-400 SIEMENS and Interface Board
The project, sponsored by MAPNA, is powered by a S7-300 series PLC with a printed mimic that facilitates the operation of the operation to control the three-tank annealing system. Marshalling records, REPEATER is also a separate panel In this collection.
There are 7 REMOTR I / O S7-300 boards and one PLD S7-400H transmitter and 42 local ET-200 PRO SIEMENS devices.
The project, which is sponsored by MAPNA, is a S7-300 PLC series with a printed mimic that facilitates the operation of the operation to control the annealing system. Marshalling records, REPEATER is also a separate panel in this collection. .
The project, which is the first-time contractor of Power Stable Conversion and its parent company, MAPNA's parent company, P.O.G.C, was designed and implemented as a Redundant CPU. The project is based on the Siemens S7-300 Series PLC, based on the Siemens Redundancy Solution and Siemens software solution, and is now on the site of the installation and delivery project of the Employer.
Construction and assembly of the PLC-S7 300 REDUNDANT panel pumping station in Kish Island
The project, which is the first-time contractor of Power Transmission Corporation and its employer, is powered by a S7-200 series PLC with MIMIC, which facilitates operation, to control the system.
Installation of MV & LV boards. Bijar Strait Gas Project
The project, which is the first-time contractor of Bein Saman Land and its employer, MAPNA, has been using a PLC S7-200 series with a printed Mimic that facilitates the operation of the operation to control the annealing system. Marshalling and REPEATER also They are part of this collection.
It consists of two sets (9) Full Fully Redundant SPIRIT computer with a Siemens Series 400 LED Backend
The project, which is the first-time contractor of Bean Saman Land and the company's mopena company, has been using a S7-300 series PLC for controlling the system. Due to the high number of inputs in the output, which is not enough as a result of a 300 series rack and was used with expansion rack. Also on this board, for the first time, a S7-200 Series PLC was used to implement the Logic Alarm Window (Announciator) as a standard CPU with LED lighting cells. The boiler was made by Pakman Company.
Construction and assembly of six units of exhaust gas analyzers output of gas units of Ali Abad Katoul and Shiraz power plants
The project, which is the first-time contractor for Power Transmission Corporation and its employer, is a OMRON PLC used to control the system.
Design, construction and commissioning of 250KW Soft Starter boards with 2500 amp network with intelligent coupling system.
The project, which is the first-party contractor of Sadra Corporation and its second-hand contractor Ammon Gostar Aria and its main employer, MAPNA, has been using a OMRON PLC with monitoring for monitoring the system.
Water control panel (inverter) for water well in Dezful
The project has been designed and commissioned for two-speed diesel start-ups and the corresponding voltage monitoring, and if a diesel is left out of the circuit, it will be replaced by a LOGO that is used to control the delivery of the employer.
Construction and Welding Panel PLC-S7 300 Boiler and Boiler Auxiliary and Heater Piping (Heath Tracing)
This project was designed and implemented to control the danger lights of Mahan Imam Khomeini Airport. The monitoring and monitoring of the communication and the safety of the lights are also checked, and if there is a fire or a line failure or even a relay breakdown, we will have alarms for that set. The control of a LOGO has been used and delivered to the employer (Mahan Airlines).
Construction, assembly and commissioning of three sets of three-way control plates 330KW 330KW transmission line Irand Petrochemical water supply with the main key 2500 amps
The project, which has the task of heating the liquid fuel lines from the reservoirs to the Turbine Hall, is now installed on the site of the installation and delivery site of the employer.
Making and Wiring 8 PLC-S7.300 & CPU-S7.400 / REDUNDANT Panel with 29 PLC ET-200 PRO Local Control Panel
Following the increase in the number of tanks from two to six, and in order to use the existing features and panels, while maintaining the original PLC of the old Siemens Series 300, the old panel door was replaced and the processor needed the inputs and outputs needed, and as a whole It was re-programmed. The windows has been replaced and the processor has used a Siemens Series 200. This panel is now on the site of the installation and delivery project of the employer.
Construction and wiring of PLC-S7.400-redundant boards and chlorination boards, balances and valves of the transmission line of the water transmission project from Doshdi Dam to Mashhad
The project, the employer of which is Nikan Process and the main employer of MAPNA, has software and hardware defects that were fixed on the site and delivered to the employer. The controller of this Siemens Series 300 series was.
Construction, assembling, winding and installation of 9 slab 7.2KV petrochemical equipment in Imam Branch of Pars
Aliabad Power Plants Complete Programming and Commissioning Project
Panel 7.2KV Power Supply, Control Panel DC POWER Control Panel Controls Shadam Shadam Mine Chador Malu
The project, the employer of which is the company's constant energy conversion company and its main employer, is using the Siemens 200 series PLC and is now on the site for the installation and delivery of the employer.
Construction and implementation of 6KV 6KV petroleum line in Mahshahr petrochemical plant
The project, which was co-sponsored by Behin Saman Noorhan and the main employer of MAPNA, was used by a controller PLC that was tested on the site, tested and delivered to the employer.
Hootanir Co